MANUFACTURING

Woven Garment
Manufacturing

Woven apparel production with technical sampling, cutting, sewing and finishing resources.

Workers sewing garments along a factory production line
Factory archive · 2018

TECHNICAL DEVELOPMENT

The first piece
sets the direction.

Please provide a complete tech pack with production-ready drawings and specifications, or a physical sample garment, for review. We use these materials to discuss construction, fit, fabric and sampling requirements. Reference photos, concept sketches or ideas alone are not sufficient for us to start development.

Sample maker marking dark fabric beside a ruler
Factory archive · 2018

INSIDE THE PROCESS

One garment.
Many careful steps.

01

Sample development

Discuss measurements, materials and construction. Paper patterns and sample work make the product brief tangible.

02

Fabric preparation

Coordinate fabric and trims, with material inspection and preparation before cutting.

03

Cutting & fusing

Spreading, cutting and interlining preparation create the components for garment assembly.

04

Sewing & assembly

Sewing stations and hanging transport connect the garment’s construction steps.

05

Finishing & inspection

Pressing and inspection bring attention to appearance, construction and garment details.

06

Packing & dispatch

Folding, packing and finished-goods storage prepare garments for the next stage.

EQUIPMENT & WORKROOMS

Tools for the work.

Flatbed cutting machine with brown pattern paper
Factory archive · 2018

Pattern output & cutting

CAD plotting, paper-pattern cutting and template-related equipment.

Workers spreading light purple fabric on cutting tables
Factory archive · 2018

Fabric preparation

Spreading tables, cutting equipment and interlining preparation.

Equipment images are from our 2018 archive. Current equipment allocation, capacity and production scheduling are confirmed for each enquiry.

Planning your production

MOQ

Minimum quantities depend on the style, colour, fabric and trim requirements.

Sampling

Sample timing depends on the available technical information, materials and revision stages.

Delivery

Production timing is discussed against material readiness, approvals and the factory schedule.

For more information about minimum quantities, sampling and lead times, see our garment manufacturing FAQ.

Tell us about
your next collection.

Share your garment brief, target quantity and delivery window.

Scroll to Top